Six conditions that need to be met in the construction of pu sandwich panel production line

Author: Sinowa/Post Date: 2021-08-02/Keywords: pu sandwich panel production line

Sinowa is familiar with the trends of the thermal insulation industry at home and abroad, and always brings effective first information to the readers. Today, I will bring you six conditions that need to be met for the construction of the polyurethane sandwich panel production line:

First of all, the polyurethane sandwich panel base wall should meet the requirements of the specification, and it has been checked and accepted.

pu sandwich panel production line

The construction of the polyurethane sandwich panel project should be carried out after the base layer is painted with a cement mortar leveling layer and the construction quality is qualified.

Before the construction of the thermal insulation project, the outer door and window openings should pass the acceptance, the size and location of the openings should meet the design requirements and the acceptance should be qualified. The door and window frames or auxiliary frames should be installed and waterproofed. The embedded parts and connectors of fire ladders, downpipes, various entrance pipelines and air conditioners that extend out of the wall should be installed, and the thickness of the polyurethane sandwich panel should be reserved.

pu sandwich panel production line

External wall scaffolding for the installation of insulation boards is required, and the scaffolding should be stable and reliable.

The ambient temperature during construction should not be higher than 35℃, should not be lower than 5℃, and should not be lower than 0℃ within 24h, and the wind should not be higher than level 5. Rainproof measures should be taken during construction in rainy days.

pu sandwich panel production line

The incoming materials of polyurethane sandwich panels should be stored in a dry and cool place, and the storage period and conditions should be in accordance with the requirements of the material supplier’s product description.

The above is the construction requirements for polyurethane sandwich panels brought to you today. Sinowa is engaged in pu sandwich panel line equipment and has unique insights on the process of color steel insulation panels. More customers are welcome to come to consult.

Page Url: http://www.fortune-re.com/en/six-conditions-that-need-to-be-met-in-the-construction-of-pu-sandwich-panel-production-line.html

You are here: Home / News / Six conditions that need to be met in the construction of pu sandwich panel production line
Contact Us
Email: sinowa@sinowa.cn
Call: +0086 151 0610 6366
Add: High-tech Industrial Development Zone, Zhenjiang, China
主站蜘蛛池模板: 国产精品人人做人人爽| 岳丰满多毛的大隂户| 全免费a级毛片| 久久婷婷五月综合色99啪| 亚洲av无码av吞精久久| 国产欧美久久一区二区三区| 乱子伦一区二区三区| 亚洲av无码国产丝袜在线观看| 人妻少妇熟女javhd| 亚洲熟妇少妇任你躁在线观看| 国产偷抇久久精品a片69| 成人毛片无码一区二区三区| 内射极品少妇xxxxxhd| 狂野欧美激情性xxxx| 99久久免费国产精品| 人妻 丝袜美腿 中文字幕| 日韩精品区一区二区三vr| 亚洲色大成网站www永久麻豆| 性猛交╳xxx乱大交| 日日日日做夜夜夜夜无码| 国产无人区码一码二码三mba| 台湾佬中文娱乐网22| 亚洲精品无码不卡| 国产做无码视频在线观看| 日本在线看片免费人成视频1000| 国产亚洲精品自在久久| 无码人妻精品一区二区| 一本精品中文字幕在线| 热久久美女精品天天吊色| 久久青青草原亚洲av无码| 极品成人影院| 97影院理论午夜伦不卡| 中文字幕av日韩精品一区二区| 日本中文字幕有码在线视频| 国产互换人妻hd| 黑人大群体交免费视频| 在线成人一区二区| 好爽毛片一区二区三区四| 久久精品国产99久久久| 亚洲av色影在线| 人妻夜夜爽天天爽一区|